MAISON BY. CONSTRUCTION JOURNAL: JANUARY 2016

22/03/2016

Good Morning! Today in Singular Studio we want to share with you a new video about the MAISON_BY, a house located in Jávea. The video corresponds to the works carried out during the month of January. Here you can see several constructive processes like the basement walls assembly and formwork, the concrete pouring (white and grey concrete), the concrete vibration, and finally, you can see the final aspect after the formwork removal. For the seen white concrete walls, it has been designed the position of the joints and holes needed for the formwork, in order to obtain the desired aesthetic result. It has been used new phenolic panels to obtain this result and a kind of special formulation concrete. The video also shows the techniques prevision and the stairs wall construction process. The end of the video shows the house construction evolution through the picture system called time lapse. This remote control device Singular Studio has been installed on the crane. You can obtain more information about it this link.

You will find more videos of the construction of this house in the accounts of Twitter and Facebook that Singular Studio has, and other posts that may interest you.

Share this post
Top   CALL US   +34 966 447 029