CR_HOUSE. CONSTRUCTION JOURNAL: MARCH 2016

01/06/2016

Good afternoon. Today, in Singular Studio we want to share with you a new video of the CR_HOUSE that corresponds to the month of March. As you can see, the detached house located in Javea is very advanced. It has been taking place several works in the exterior spaces: It has already been placed the tiles in the swimming pool, the terrace area has been paved, the access ramp and the plot perimeter wall have been realized, etc. You can also see the construction of the platform that will be the solarium area, located on the deck of the house, and finally, you also can see the placement of the jacuzzi in the exterior area, near to the cliff. Furthermore it has also been realized works in the interior of the house like the sauna placement, the false ceiling placement and the technics connection.

You can find more videos of the construction of this house in the accounts of Twitter and Facebook in Singular Studio, and other posts that may interest you.

Share this post
Top   CALL US   +34 966 447 029