MAISON BY. CONSTRUCTION JOURNAL: JULY 2016

21/10/2016

Good afternoon! Today, in Singular Studio we finish the week sharing with you a new video of the Maison_By, the detached house located in Jávea. The video shows the different construction processes that have been taking place during the month of July. One of them is the pergola formwork process, its assambly and its concrete pouring. This pergola is situated on the ground floor terrace. The video also shows the first floor formwork, assambly and concrete pouring. The end of the video shows the house construction evolution through the picture system called time lapse. This remote control device Singular Studio has been installed on the crane. You can obtain more information about it this link.

You can find more videos of the construction of this house in the accounts of Twitter and Facebook in Singular Studio, and other posts that may interest you.

Share this post
Top   CALL US   +34 966 447 029