CR_HOUSE. CONSTRUCTION DIARY: JULY 2015

07/08/2015

Hello friends, today we show you the construction diary video of the detached house located in Javea: the CR_House. It corresponds to the month of July. The video shows several construction phases that are taking place at this moment, like the slab pool assembly, the details insertion in ground floor concrete walls, and the treatment of the concrete of them, a very important phase, so this concrete will be the final appearance of the exterior and interior walls. It has already begun the assembly and formwork of the first floor slab. We invite you to visit our accounts that Singular Studio has in Twitter and Facebook, where you can find more construction videos of this house and other posts that could interest you. We hope you like it, we leave with it. See you soon!

Share this post
Top   CALL US   +34 966 447 029