CR_HOUSE. CONSTRUCTION DIARY: DECEMBER 2015

02/02/2016

Good Morning! Today we show a video about the evolution of the CR_HOUSE construction, the detached house located on the edge of a cliff in Jávea. As you can see, we have already poured the concrete on the roof that defines the house volume. The video also shows the exterior stairs assembly and formwork, the waterproofing layer under the metallic carpentry, the perimeter walls drainage and the provision of the holes for installations. Finally, you can see the house general aspect at this stage of construction and the works to prepare the garden outside the house.

You can find more videos of the construction of this house in the accounts of Twitter and Facebook in Singular Studio, and other posts that may interest you.

Share this post
Top   CALL US   +34 966 447 029